Install Dewatering System at Wastewater Treatment Plant # 11, MCB Camp Pendleton, CA
Delivery Type: Design-Build
Contract Value: $567,706
Description:
Designed, built, and installed a custom prototype Mobil Sludge Press for Sewer Treatment Plant 11 on MCB Camp Pendleton.
Required custom fabrication of trailer designed to access existing sludge beds.
Designed the system to meet the customer’s specific digester specifications.
Installed new electrical for the new equipment requirements.