Install Dewatering System at Wastewater Treatment Plant # 11, MCB Camp Pendleton, CA

Delivery Type: Design-Build
Contract Value: $567,706
Description:

  • Designed, built, and installed a custom prototype Mobil Sludge Press for Sewer Treatment Plant 11 on MCB Camp Pendleton.

  • Required custom fabrication of trailer designed to access existing sludge beds.

  • Designed the system to meet the customer’s specific digester specifications.

  • Installed new electrical for the new equipment requirements.