University Hall Room 270 Renovation, CSUSM

Delivery Type: Design-Bid-Build
Contract Value: $39,910
Description:

  • Involved demolition of an existing storage space shared between Room 270 and an adjacent classroom and construction of a new alcove entrance to Room 270.

  • Demolished storage room walls, doors, and ceiling. Installed new metal framing and gypsum board, doors, hardware, and acoustical ceiling and painted the entire room interior.

  • Required extensive fire proofing including the installation of new fire dampers and modifications to the existing ductwork to achieve the new required fire rating.

  • Even though delays were encountered for unforeseen circumstances, the project was successfully completed more than a month ahead of the scheduled contract completion date.