Operations Group Mobility Storage Facility, Seymour Johnson AFB, NC

Delivery Type: Design-Build
Contract Value: $675,134
Size: 4,800sq. ft.
Description: Involved demolition of an existing CMU block building and design and construction of a new, metal, 4,800-SF war readiness materials (WRM) storage facility. Key features include:

  • Site preparation and earth work including proper drainage and the replacement of asphalt, concrete, and subgrade material for the new foundation and driveway.

  • Facility contains an 80-SF unisex restroom compliant with ADA requirements, a 200-SF office space, and a mechanical room.

  • Architectural features include new walls, ceiling, framing, mezzanine design and construction, doors, and windows.

  • Installation of all electrical, HVAC, plumbing, communications, and fire protection systems for a complete and usable facility.

  • Two coiling overhead doors with electric motor operators.